Crestwood City Hall
Repair and restoration of a city hall’s architecture, infrastructure, and interiors.
-
Client: City of Crestwood
Location: Crestwood, MO
28,600 SF
Completed 2021
-
Architectural Design
Interior Design
Code Compliance and ADA
Construction Documents
Construction Administration
-
New interior finishes
New bullet resistant dais
New microphones and speakers in board room
New TV displays in board room
New / upgraded lighting in board room
New existing skylights and repairs to existing roof
New ADA accessible entry ramp
After a flood in the building, Crestwood City Hall and Police Station had extensive damage to its interior finishes. In addition, the main entrance to the building was not wheelchair accessible and the skylights in the lobby were cracked and leaking. Finishes were updated in all the damaged areas and the board room received technology upgrades. A new ADA ramp was constructed to match the look of the main entry stairs. Leaking skylights were replaced and the roof was repaired to stop further leaks.